PIES - Part 2: Trail Design and Maintenance

Sunday, December 11th, 2016 from 10:00am to 2:00pm (CT)

About

This workshop includes methods and techniques for safely planning and installing a park trail and is a half-day classroom workshop, with a post lunch two hour session for learning to use the field instruments; Sunday morning is a half-day with a trail project at Stephenson Nature Preserve.  

Schedule:  
Saturday 12/3:   Pleasant Hill Branch Library conference room  -  
211 E William Cannon Dr, Austin, TX 78745 
(10a.m. - 1p.m. classroom; then 2 - 4p.m. field instrumentation techniques) 

Following Sunday 12/11:  Stephenson Nature Preserve (9a.m. - 1p.m.) - Application of field techniques and trail repair.

Proper trail design and construction promote sustainable trails that maximize hiking aesthetics and minimize repair and erosion. Professional trail designers from S&S Trails Inc. will join us for a classroom session and a hands-on workday.


Rain Date:  
Classroom session is rain or Shine! 
Applied trail care at Stephenson Nature Preserve - Sunday, December 11th.
Positions
0 Remaining
Age Limit
18 and up
Requirement Details
Sunday December 11th, morning: Applied trail work from classroom instruction.
Perks
KIND healthy snacks for all participants.
Tools and gloves provided.
Parking Details
Parking available at Longview Park.
GivePulse
9 Positions Filled | 1 Impact | 3 Hours